A slew of infrastructure works pertaining to road, air and rail in Mysuru have been impacted by alignment issues as a result of which the projects have been delayed, besides adding to cost escalation.
HYDERABAD: Hyderabad Airport Metro Ltd (HAML) Managing Director (MD) NVS Reddy conducted an inspection to resolve technical issues related to the alignment of the proposed Metro rail corridors to ...
目前正在顯示您可能無法存取的結果。
隱藏無法存取的結果